Monday, December 10, 2007

Casa Update 8

All,

Well if you believed the move-in date in the last email, you do not know Mexico. They are making progress. But, the holes for the Pendants are still holes. It seems that our Electrical sub-contractor is also our plumber. Well, after the heavy rain last Friday seems that all of his workers were out fixing roof leaks. We even have one. Good, we have ours out of the way. I need to devote an entire paragraph, oops, chapter to the Granite saga.

We got a call from our customer service rep (Sabina) at 8:30 on Wednesday. Seems that Lupe did not bring up the sink to the casa and the installers were there. So, we do a quick wash (we wait till full sun before showers, solar thing you know) and head for their office. When we get to the casa, everyone is standing around with a truck full of Granite slabs. Seems their local guy (they were from Mexicali) did not tell them that we had no power. No problem he says, I have a generator coming. Well an hour later the generator arrives. But they cannot get it started, I even tried all of my old tricks for starting the lawn mower. Well, it is now 10:00 and they have retreated to the truck to get a siesta. In a panic, I call Lupe to see if he could bring out a generator. He says, no problem, he will get one sent up right away. About a half hour later, up the road comes a caravan. Yay, I think. Well, it is Sabina, Lupe, an Overseer and his customer. No generator. All they want to do is show the customer our casa and the woodwork. I ask Lupe about the generator. He says it is on the way. An hour and a half later it finally arrives. It is now Noon. They fire it up and start working like 3 people on speed. I would not leave until we had the sinks and faucets placed. At 1:30 we accomplished this as the hunger pains overtake us and we book it back to the Ramada for lunch. We get back an hour later and they are still grinding and sanding the sink cutouts. This goes on for another hour. They finally set the sinks into the island and start to get ready to bring in that piece (the island countertop is a single piece). We went out back while they carried it into the casa. It is now 4:00 and the sunlight is fading. Someone calls out for some flood lights as the generator runs out of gasoline. They fill it again and try to start it. No luck. I call their local guy with a warning that we might have a problem again. He says that he was getting ready to bring out the flood lights and would bring out the original generator's owner to get that one started just in case. One of Lupe's workers arrives for their generator. A lot of Spanish transpires and he leaves. Finally they get the second generator working again as the floodlights arrive. You would be surprised of all the uses for a one liter plastic Coke bottle. It is now 5:00 and it is almost dark. They start installing the raised bar. We have been there since 8:30 that morning and finally can't take it any more and get ready to leave. We were asked to wait and sign a form. Regina's Spanish was good enough that we were signing the final release. We said "no" and they understood. They called the local guy again and we talked. We agreed to come back at 8:30 on Thursday to inspect the completed installation. Lupe's worker arrives again for the generator. More Spanish and he leaves again. We leave. On Thursday morning, we arrive to inspect the work. It is beautiful, inspected all of the seams and they were perfect. They had it all polished up and even dusted the cabinets for effect. Talking to the local guy we find out that they thought that this job would be a "slam dunk" and they would be out of there by 2:00 and did not bring any lunch or money for lunch. The local guy had to go out and get them lunch and dinner then back again when they completely ran out of gasoline. They finally finished at 10:00 that night.

Well, all the appliances are in country and the range, range hood and BBQ are at the casa. They put on all of the finishing touches yesterday and today. They broom cleaned and mopped today. They even raked the sand out front! The AV guy we hired had all of the stereo, TV and internet wiring pulled. He should finish on Monday. Now, if we could get an electrician out, we might be able to move in on Thursday. I'm not telling which week that is yet. Pictures will be attached to that email. With all of the appliances crowding the kitchen, pictures would not do the casa justice. Oh, and remind me to tell the saga of the propane hookup in the garage (it is shorter than the Granite Saga I hope) when it finally plays out.

Regards,

Larry and Regina

Pictures: http://picasaweb.google.com/LarEWill50/Casa4?authkey=Gv1sRgCNCV0YGbvve7pQE&feat=directlink